Rehabilitation Clinic Commercial Construction BuildOut by Marvel Construction Group. . . A Referral, a Vision, and a Tight Budget
- Adam Leo

- Apr 20
- 3 min read
Updated: Apr 24

Building PhysWell Rehabilitation’s First Clinic
on a 10‑Week Deadline
When Lauren Schute, DPT, founder of PhysWell Rehabilitation, was referred to Adam Leo, Principal of Marvel Construction Group, she had a clear vision for her first clinic — and a budget that couldn’t budge. She needed a partner who could guide her through design, permitting, and commercial construction without sacrificing quality or timeline.
“Adam treated my project like it was his own business on the line,” Lauren later shared. “He helped me design the space, kept me on budget, and pushed the schedule so I could open before year‑end.”
PhysWell had secured a grey‑shell retail suite in St. Johns County — no slab, no HVAC, no electrical panel, no framing. Just an empty box and a hard deadline: open before December 31st to meet operational and tax‑year goals. This was surely a rehabilitation clinic commercial construction buildout challenge.
Design‑Assist Leadership That Protected the Budget
Understanding the financial constraints, Adam began with a design contract, coordinating architectural drawings through a trusted architect he partners with regularly. This approach ensured:
Accelerated construction contract and buildout start
Cost‑controlled design
Constructability alignment
Zero surprises when transitioning to construction
To stretch the budget further, Adam leveraged his MEP subcontractors’ in‑house engineering capabilities, eliminating the need for a costly third‑party engineering firm. This strategic move saved the client thousands while still meeting code and project requirements.
“Our job is to remove obstacles and protect the owner’s budget,” Adam said. “Design‑assist is where we can create the most value early.”
Fast‑Tracked Permitting to Meet a Hard Deadline
With the clock ticking, Marvel engaged a permit expediter — a premium service not typically included in standard GC scope — to accelerate approvals through St. Johns County.
Permit issued: 10/13/2025
This step shaved weeks off the typical permitting timeline and kept the project on track for a year‑end opening.
A Holiday‑Season Build‑Out with No Room for Delay
The toughest challenge came next: completing a full medical tenant build‑out in just 10 weeks, during the holiday season when subcontractor availability is at its lowest.

The space required:
· A new concrete slab
· Full MEP installation
· Interior framing and finishes
· Medical‑use compliance
· Inspections and final CO
Through tight sequencing, daily communication, and proactive material coordination, Marvel kept the project moving without a single lost day.
Construction completed: 12/24/2025
Certificate of Occupancy issued: 12/26/2025
PhysWell opened before year‑end — meeting its tax deadline and launching operations exactly as planned.
A Space That Reflects PhysWell’s Mission
The finished clinic is a clean, modern, patient‑ready environment that supports PhysWell’s hands‑on, performance‑driven approach to rehabilitation. It’s a space built with intention — and built fast.
“This is exactly the kind of challenge we excel at,” Adam said. “Design support, cost‑saving strategies, and disciplined execution, all aligned to help a small business open its doors on time.”
Everybody Wins with Marvel Construction Group
Delivered on budget
Delivered on a 10‑week schedule
Achieved CO before year‑end
Enabled the client to save significantly on taxes
Provided turnkey design‑assist + expedited permitting
Transformed a grey shell into a fully operational clinic
MarvelConstructionGroup.com consistently demonstrates what elevated service looks like in commercial construction — especially for medical and rehabilitation clients who need precision, speed, and advocacy.
Feel free to reach out to Adam any time at 904.599.8950 or Adam@MarvelConstructionGroup.com


Comments